PBS Engineering and Environmental

City of Woodland SR 503 Widening

Location: Washington

Project - SR 503 Widening & Survey

This federally-funded project for the City of Woodland, Washington consisted of widening and realigning a portion of SR 503 between Scott Avenue and Gun Club Road. The project widened the existing two-lane roadway to provide adequate shoulders and left turn pockets at Hillshire Drive, Insel Road, and Gun Club Road. HDJ (now a division of PBS) provided project management, transportation design, stormwater management, traffic analysis, utility coordination, and land surveying services.

Project development required extensive coordination with WSDOT and the City of Woodland to resolve lane configurations, construction staging, and traffic impacts. Project elements included roadway design, environmental permitting, NEPA clearance, ROW acquisition, archeological analysis, and geotechnical analysis, construction management and inspection.

Scope of Services:

  • Right-of-Way Acquisition
  • Topographic Survey
  • Construction Staking & Legal Descriptions
  • Transportation, Traffic & Civil Engineering
© 2019 PBS Engineering and Environmental Inc.

You are now leaving the PBS website.

PBS Engineering and Environmental provides links to web sites of other organizations in order to provide visitors with certain information. A link does not constitute an endorsement of content, viewpoint, policies, products or services of that web site. Once you link to another web site not maintained by PBS, you are subject to the terms and conditions of that web site, including but not limited to its privacy policy.

You will be redirected to

Click the link above to continue or CANCEL